Açık Akademik Arşiv Sistemi

Time - Cost Relationships for Superstructure Projects in Turkey

Show simple item record

dc.rights.license Bronze
dc.date.accessioned 2021-06-03T08:20:22Z
dc.date.available 2021-06-03T08:20:22Z
dc.date.issued 2020
dc.identifier.issn 1300-3453
dc.identifier.uri www.doi.org/10.18400/tekderg.456761
dc.identifier.uri https://hdl.handle.net/20.500.12619/95156
dc.description Bu yayın 06.11.1981 tarihli ve 17506 sayılı Resmî Gazete’de yayımlanan 2547 sayılı Yükseköğretim Kanunu’nun 4/c, 12/c, 42/c ve 42/d maddelerine dayalı 12/12/2019 tarih, 543 sayılı ve 05 numaralı Üniversite Senato Kararı ile hazırlanan Sakarya Üniversitesi Açık Bilim ve Açık Akademik Arşiv Yönergesi gereğince açık akademik arşiv sistemine açık erişim olarak yüklenmiştir.
dc.description.abstract The concept of time-cost relationship in construction projects was first introduced by Bromilow, using the data of the 328 superstructure projects completed in Australia. The aim of this study is to determine the time-cost relationship of superstructure projects in Turkey. Time and cost data of 460 superstructure projects completed between the years of 1999-2018 was used in the study. Data was grouped primarily on the basis of the intended use of buildings (individual buildings, educational buildings, hospitals, industrial buildings and social housing), and then time-cost relationships were separately determined for each group through statistical analysis. In addition, the effects of the parameters such as exchange rates and the number of non-working days on the time-cost relationship were investigated statistically, as well. As a result of this study, highly meaningful time-cost relationships (R-2 =0,60) are determined for the construction projects in Turkey, excluding disaster relief projects, which is not part of this study. It has also been determined that while the hospital projects in Turkey have the highest coefficient of determination (R-2=0,87), social housing projects have the lowest (R-2=0,54).
dc.language English
dc.language.iso İngilizce
dc.publisher TURKISH CHAMBER CIVIL ENGINEERS
dc.relation.isversionof 10.18400/tekderg.456761
dc.rights info:eu-repo/semantics/openAccess
dc.subject Bromilow's time-cost (BTC) model
dc.subject building projects
dc.subject construction management
dc.subject duration estimation
dc.subject regression analysis
dc.title Time - Cost Relationships for Superstructure Projects in Turkey
dc.type Article
dc.identifier.volume 31
dc.identifier.startpage 9869
dc.identifier.endpage 9896
dc.relation.journal TEKNIK DERGI
dc.identifier.issue 2
dc.identifier.wos WOS:000518474000004
dc.identifier.doi 10.18400/tekderg.456761
dc.contributor.author Sonmez, Murat
dc.contributor.author Dikmen, S. Umit
dc.contributor.author Akbiyikli, Rifat
dc.relation.publicationcategory Makale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı


Files in this item

This item appears in the following Collection(s)

Show simple item record