dc.contributor.advisor |
Profesör Doktor Mirali S. Alosman |
|
dc.date.accessioned |
2021-03-25T13:23:42Z |
|
dc.date.available |
2021-03-25T13:23:42Z |
|
dc.date.issued |
2004 |
|
dc.identifier.citation |
Gündoğdu, İsmail. (2004). 500.000 nüfuslu bir yerleşim bölgesinin içme suyu projesi. (Yayınlanmamış Yüksek Lisans Tezi).Sakarya Üniversitesi Fen Bilimleri Enstitüsü; Sakarya. |
|
dc.identifier.uri |
https://hdl.handle.net/20.500.12619/82015 |
|
dc.description |
06.03.2018 tarihli ve 30352 sayılı Resmi Gazetede yayımlanan “Yükseköğretim Kanunu İle Bazı Kanun Ve Kanun Hükmünde Kararnamelerde Değişiklik Yapılması Hakkında Kanun” ile 18.06.2018 tarihli “Lisansüstü Tezlerin Elektronik Ortamda Toplanması, Düzenlenmesi ve Erişime Açılmasına İlişkin Yönerge” gereğince tam metin erişime açılmıştır. |
|
dc.description.abstract |
Anahtar Kelimeler: însan, su, Kapta Arıtma, DepolamaYüksek lisans bitirme tezi kapsamında hazırlanan bu çalışma içme suyunun yer altı ve yüzeysel sulardan toplanarak arıtımları sağlanarak kullanılmasını kapsamaktadır. Bu projede içme suyunun bir kısmı yer altı sularından bir kısmı yüzeysel sulardan alınarak yapılmıştır. Yer altı suları depolama esnasında havalandırılmak suretiyle arıtılarak ve klorlanarak içme suyu hattına verilmesi sağlanmaktadır. Yüzeysel sular ise ön çöktürme, kimyasal arıtma ve fıltrasyon işlemlerinden sonra klorlanarak içme suyu hattına verilmesi sağlanmaktadır. Hazırlanan bu proje, proje inşa süresi dahil olmak üzere 35 yıllık süreci kapsamaktadır. Bu proje iki kademe halinde planlanmış olup I. Kademe inşa süresi dahil 20 yıl, II. Kademe ise 15 yıl olmak üzere planlanmıştır. vı |
|
dc.description.abstract |
Keywords: Human, water, Refining in a container, to store.This study that had been studied as a MBA graduate thesis includes using drinking water which is gathered from groundwater and surface water and then is refined. In this project, the study had been made by some of drinking water was taken from groundwater and other was taken from surface water. The groundwater is provided to given the drinking water line by made airing and then to chlorinate into it during to store. As for surface water is provided to given the drinking water line after precollapsed, and chemical refining and to filter process. This prepared project with including built-time of project includes a process of 35 yearly. This project was organized into two section. The first section had been planned for 20 yearly with including built-time of project and second section had been planned for 15 yearly. vn |
|
dc.format.extent |
VII, 64 yaprak : şekil ; 30 cm. |
|
dc.language |
tur |
|
dc.language.iso |
Türkçe |
|
dc.publisher |
Sakarya Üniversitesi |
|
dc.rights.uri |
http://creativecommons.org/licenses/by/4.0/ |
|
dc.rights.uri |
info:eu-repo/semantics/openAccess |
|
dc.subject |
İnsan |
|
dc.subject |
Su |
|
dc.subject |
Kapta arıtma |
|
dc.subject |
Depolama |
|
dc.title |
500.000 nüfuslu bir yerleşim bölgesinin içme suyu projesi |
|
dc.type |
TEZ |
|
dc.contributor.department |
Sakarya Üniversitesi, Fen Bilimleri Enstitüsü, Çevre Mühendisliği Anabilim Dalı, Çevre Mühendisliği Bilim Dalı |
|
dc.contributor.author |
Gündoğdu, İsmail |
|
dc.relation.publicationcategory |
masterThesis |
|