Açık Akademik Arşiv Sistemi

Restarting Scheme of Electrical Motors After Supply Voltage Outages in Heavily Loaded Industrial Facilities

Show simple item record

dc.contributor.authors Kucuk, S; Fernandez, LF; Bayrak, M; Yilmaz, AS;
dc.date.accessioned 2020-02-27T07:00:21Z
dc.date.available 2020-02-27T07:00:21Z
dc.date.issued 2015
dc.identifier.citation Kucuk, S; Fernandez, LF; Bayrak, M; Yilmaz, AS; (2015). Restarting Scheme of Electrical Motors After Supply Voltage Outages in Heavily Loaded Industrial Facilities. 2015 9TH INTERNATIONAL CONFERENCE ON ELECTRICAL AND ELECTRONICS ENGINEERING (ELECO), , 603-599
dc.identifier.uri https://hdl.handle.net/20.500.12619/64735
dc.description.abstract This paper presents the automatic motor restarting scheme applied at a large oil refinery where more than 600 motors are assigned to automatic restarting. Application criteria for motor restarting, power system simulations and physical implementation of this scheme are discussed in this paper.
dc.language English
dc.publisher IEEE
dc.subject Engineering
dc.title Restarting Scheme of Electrical Motors After Supply Voltage Outages in Heavily Loaded Industrial Facilities
dc.type Proceedings Paper
dc.identifier.startpage 599
dc.identifier.endpage 603
dc.contributor.department Sakarya Üniversitesi/Mühendislik Fakültesi/Elektrik-Elektronik Mühendisliği Bölümü
dc.contributor.saüauthor Bayrak, Mehmet
dc.relation.journal 2015 9TH INTERNATIONAL CONFERENCE ON ELECTRICAL AND ELECTRONICS ENGINEERING (ELECO)
dc.identifier.wos WOS:000380410800110
dc.contributor.author Selahattin Kucuk
dc.contributor.author Luis Fernandez Fernandez
dc.contributor.author Bayrak, Mehmet
dc.contributor.author Ahmet Serdar Yilmaz


Files in this item

Files Size Format View

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record