dc.contributor.authors |
Yildirim, MB; Cakar, T; Doguc, U; Meza, JC; |
|
dc.date.accessioned |
2020-02-25T11:41:07Z |
|
dc.date.available |
2020-02-25T11:41:07Z |
|
dc.date.issued |
2006 |
|
dc.identifier.citation |
Yildirim, MB; Cakar, T; Doguc, U; Meza, JC; (2006). Machine number, priority rule, and due date determination in flexible manufacturing systems using artificial neural networks. COMPUTERS & INDUSTRIAL ENGINEERING, 50, 194-185 |
|
dc.identifier.issn |
0360-8352 |
|
dc.identifier.uri |
https://doi.org/10.1016/j.cie.2006.02.002 |
|
dc.identifier.uri |
https://hdl.handle.net/20.500.12619/48231 |
|
dc.description.abstract |
When there is a production system With excess capacity, i.e. more capacity than the demand for the foreseeable. future, upper management might consider utilizing only a portion of the available capacity by decreasing the number of workers or halting production on some of the machines/production lines, etc. while preserving the flexibility of the production system to satisfy demand spikes. To achieve this flexibility, upper management might be willing to attain some pre-determined/desired performance values in a production system having identical parallel machines in each work center. In this study, we propose a framework that utilizes parallel neural networks to make decisions on the availability of resources, due date assignments for incoming orders, and rules for scheduling. This framework is applied to a flexible manufacturing system with work centers having parallel identical machines. The artificial neural networks were able to satisfactorily capture the underlying relations hip between the design and control parameters of a manufacturing system and the resulting performance targets. (c) 2006 Elsevier Ltd. All rights reserved. |
|
dc.language |
English |
|
dc.publisher |
PERGAMON-ELSEVIER SCIENCE LTD |
|
dc.subject |
Engineering |
|
dc.title |
Machine number, priority rule, and due date determination in flexible manufacturing systems using artificial neural networks |
|
dc.type |
Article |
|
dc.identifier.volume |
50 |
|
dc.identifier.startpage |
185 |
|
dc.identifier.endpage |
194 |
|
dc.contributor.department |
Sakarya Üniversitesi/Mühendislik Fakültesi/Endüstri Mühendisliği Bölümü |
|
dc.contributor.saüauthor |
Çakar, Tarık |
|
dc.contributor.saüauthor |
Doğuç, Ufuk |
|
dc.relation.journal |
COMPUTERS & INDUSTRIAL ENGINEERING |
|
dc.identifier.wos |
WOS:000238928500014 |
|
dc.identifier.doi |
10.1016/j.cie.2006.02.002 |
|
dc.contributor.author |
Çakar, Tarık |
|
dc.contributor.author |
Doğuç, Ufuk |
|