Açık Akademik Arşiv Sistemi

A novel integrated SMED approach for reducing setup time

Show simple item record

dc.contributor.authors Boran, S; Ekincioglu, C;
dc.date.accessioned 2020-02-25T11:40:53Z
dc.date.available 2020-02-25T11:40:53Z
dc.date.issued 2017
dc.identifier.citation Boran, S; Ekincioglu, C; (2017). A novel integrated SMED approach for reducing setup time. INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 92, 3951-3941
dc.identifier.issn 0268-3768
dc.identifier.uri https://doi.org/10.1007/s00170-017-0424-9
dc.identifier.uri https://hdl.handle.net/20.500.12619/48178
dc.description.abstract One of the shortcomings of the conventional single-minute exchange of die (SMED) method is that the improvements are made only upon the machine to reduce setup times. Although most of the setup activities involve operators, they are not considered adequately in this method. In workplaces with non-ergonomic setup systems, operators are exposed to different ergonomic risks, and thus, muscle fatigue is a problem for them. During the setup activities, muscle fatigue increases the setup times and risks of work accidents. In this study, the muscle fatigue assessment (MFA) method, also known as the Sue Rodgers method, was integrated into the conventional SMED method in order to evaluate the ergonomic risks in setup activities. Since the tools of the conventional SMED method are insufficient to shorten setup times, the grey-based Taguchi method, which consists of multiresponses such as setup time and fatigue risk, has been used for a setup activity. This method allows the determination of the process factor levels to minimize these responses. A form has also been developed for the integrated SMED method, which is called the Setup Observation and Analysis Form. The developed integrated SMED method based on the Sue Rodgers muscle fatigue assessment method and grey-based Taguchi method has been applied to a CNNx machine in a factory producing aluminum profiles. The overall setup time has been reduced to 73.5 min from 196 min, which indicates a total of 122.5 min and 62.5% improvement. With the conventional SMED method, the setup time is reduced to 101 min, whereas with the new approach, the setup time is reduced further to 21.5 min.
dc.language English
dc.publisher SPRINGER LONDON LTD
dc.subject Engineering
dc.title A novel integrated SMED approach for reducing setup time
dc.type Article
dc.identifier.volume 92
dc.identifier.startpage 3941
dc.identifier.endpage 3951
dc.contributor.department Sakarya Üniversitesi/Mühendislik Fakültesi/Endüstri Mühendisliği Bölümü
dc.contributor.saüauthor Boran, Semra
dc.relation.journal INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY
dc.identifier.wos WOS:000411237500067
dc.identifier.doi 10.1007/s00170-017-0424-9
dc.identifier.eissn 1433-3015
dc.contributor.author Boran, Semra
dc.contributor.author Caner Ekincioglu


Files in this item

Files Size Format View

There are no files associated with this item.

This item appears in the following Collection(s)

Show simple item record